Mining and Underground Well Drilling Rates Achieved at Yarega
Layout of Production Blocks at the Yaregsky Area of the Yaregskoye Oil Field and the Main Development Indicators
Stages of development of the Yarega Area:
Development with the well drilled from the surface without any reservoir treatment (1932 – 1943). ORF = 0,017;
Mining development without reservoir treatment (1939 – 1972). ORF = 0,04 – 0,06;
Thermal mining development (industrial) from 1972 – till now. По Developed blocks ORF = 0,51, steam to oil ratio 2,68 t/t.
Schematic Diagrams of the Minefields (Feasibility Study Oil Mine -2016)
Schematic Diagram of Production and Processing of Titanic Ore (Eyfelsky Horizon)
The System of Gathering, Transportation, and Treatment of Crude Oil (Treatment of Oil in the Mines of the Central Oil Pumping Station, TsNPS)
The System of Gathering, Transportation, and Treatment of Crude Oil
